Project Name
Metrolink L.A. Union Station 5th Lead Track Extension
Project Type
New Construction
Completion Date
2006
Location
Los Angeles, CA
Project Description
Los Angeles Union Station is the hub for the Southlands’s commuter and passenger rail network for Metrolink, Amtrak, and Metro Redline, and is located in downtown Los Angeles.
This Project consisted of adding a fifth lead track, turnouts, crossovers, and double-slip switches within active tracks. It also included reconfiguring the existing tracks and turnouts to add capacity northward out of the station toward the Ventura County and Antelope Valley lines. There is heavy passenger rail traffic on all active tracks through the site that required careful scheduling and coordinating our work with Metrolink & Amtrak operations to minimize impacts to train movement into the passenger stations. The Project was successfully completed on schedule and under budget in November 2006.
The project construction included:
- Earthwork - moved 1600 CY of material during project
- Track Removal - 850 TF
- Track Realignment - 1500 TF
- New Track Construction - 780 TF
- Turnout Removal - 6 EA
- Turnout Relocation - 3 EA
- New Turnout Construction #8 - 5 ea
- New Turnout Constructrion #14 - 2 ea
- Double Slip Switch #8 - 1 ea
- Paving - 20,000 SF
The benefits of this new lead track is that it will create operational efficiencies and flexibility, improve capacity of LA Union Station through the addition of routes for the LOSSAN corridor, eliminate many crossover and turnout movements, and provide separation of traffic on lead tracks between the major routes. In addition, it will eliminate conflicts between the major traffic flows at peak periods at LA Union Station. This capital improvement Project will increase capacity and also reduce overall impact of delays.
Scope of Work
Construct 5EA No.8 Turnouts, 2EA No.14 Turnouts, 1EA No.8 Crossover, 1EA No.8 Double Slip Switch, Remove & Relocate 6EA Turnouts, Construct 780TF of Track with wood & concrete ties, Realign 1,500TF of existing track, Remove/dispose 850TF of existing track, export/dispose 1,600CY of earthwork material, place/compact aggregate base material, install 20,000SF of asphalt pavement, install subdrain system, modify pedestrian platform, and remove & modify 3EA signal vaults.
Owner
SCRRA Metrolink
Additional Information
Visit www.metrolinktrains.com for more information.

12771 Imperial Highway
Santa Fe Springs, CA 90670
562.944.7985
info@japlacek.com
Links and Resources
The following railroad construction and maintenance resources, directories and associations are being provided for your convenience:
Railroad Resources and Directories
Project Name
Baldwin Avenue Grade Separation
Project Type
Design and Construction
Completion Date
June 2014
Location
El Monte, CA
Project Description
In coordination with UPRR, construct Double Shoofly Track for construction of new bridge for UPRR Mainline Tracks. As a Subcontractor to Sully-Miller Contracting, JA Placek Construction Co. was responsible for installation & removal of Shoofly Tracks.
Scope of Work
Construct approximately 3,000TF (track-feet) of Double Shoofly Tracks and one (1EA) Power Operated #15 Turnout with 136# CWR and Wood Ties. After completion of new bridge and new Mainline Tracks, remove and dispose 3,000TF of Shoofly Track.
Owner
Alameda Corridor East Construction Authority (ACE)
Additional Information
For more details visit https://www.theaceproject.org/

12771 Imperial Highway
Santa Fe Springs, CA 90670
562.944.7985
info@japlacek.com
Links and Resources
The following railroad construction and maintenance resources, directories and associations are being provided for your convenience: